Shenzhen, Guangdong, China alex@hangtongtech.com.cn

Кейсы

Real challenges from different industries, and how Hangtong solved them.

Consumer Electronics

Domestic Alternative for Main-Control MCU

Cost down 18%, lead time cut by 3 weeks

The customer's imported MCU kept rising in price with longer lead times. Hangtong recommended a PIN-to-PIN compatible domestic part, with software regression verified within one week.

-18% Procurement cost
-3 wks Lead time
Подробнее
Industrial Control

Global Sourcing for an EOL Interface IC

Line recovered, million-level stoppage avoided

A factory announced EOL for an interface IC the customer had used for 8 years. Hangtong sourced traceable stock globally while providing a long-term alternative — dual-track security.

72h Stock located
100% Traceable source
Подробнее
Smart Hardware

One-Stop BOM Management for 200+ Parts

Procurement cycle down from 5 days to 1

Multi-category, small-batch, multi-lot orders consolidated to a single supplier — unified lead times and invoicing, with significantly lower procurement overhead.

200+ Categories consolidated
-80% Procurement time
Подробнее
CASE 01 / Consumer Electronics

Domestic Alternative for Main-Control MCU

Cost down 18%, lead time cut by 3 weeks

Ключевые результаты Cost down 18%, lead time cut by 3 weeks

Задача клиента

The main-control MCU factory raised prices for two consecutive quarters, and lead times stretched from 12 to 26 weeks. Peak season meant no stock-outs — and no time for a redesign.

Наше решение

We compared packages, clock speeds, peripherals, Flash/RAM and temperature ranges across 6 candidates, shortlisted 2 PIN-to-PIN compatible parts, and provided free samples — software regression and peripheral testing done within a week.

Задействованные бренды ST GigaDevice Microchip
CASE 02 / Industrial Control

Global Sourcing for an EOL Interface IC

Line recovered, million-level stoppage avoided

Ключевые результаты Line recovered, million-level stoppage avoided

Задача клиента

The EOL announcement left the customer with open orders still in delivery. Redesign cost and schedule were both unacceptable.

Наше решение

Activated global distribution channels, located two traceable stock lots within 72 hours with inspection records archived; provided a long-term alternative with a validation checklist for the next hardware revision.

Задействованные бренды TI ADI onsemi
CASE 03 / Smart Hardware

One-Stop BOM Management for 200+ Parts

Procurement cycle down from 5 days to 1

Ключевые результаты Procurement cycle down from 5 days to 1

Задача клиента

Each unit carried 200+ part numbers spread across 9 suppliers. Every batch meant repeated quoting, comparison, chasing and reconciliation — procurement was drowning in trivia.

Наше решение

One quote for the full BOM, consolidated supply and unified lead times; buffer plans for long-lead parts and cost-down alternatives where substitutable — procurement talks to one dedicated helper only.

Задействованные бренды Samsung Micron Espressif JST

Похожая задача? Возможно, мы её уже решали

Опишите список позиций и цели — вы получите конкретный план, а не «постараемся как получится».