Why kitting a BOM eats two weeks
It is rarely about availability — it is that nobody lines the scattered part numbers up for you.
- Parts spread across a dozen channelsEvery channel comes with its own quotes and lead times. Your buyer spends most of the week reconciling spreadsheets.
- Small volumes get no attentionA prototype run needs tens of pieces. Factories and tier-one distributors won’t take it, so you source piece by piece.
- One missing part stalls the batchAmong dozens of part numbers, a single shortage pushes the whole assembly schedule.
- Alternatives feel risky to sign offCheaper substitutes exist, but without parameter comparisons and test data you cannot commit.
- Pricing is opaqueQuotes for the same part can differ by 30% between channels — and you cannot tell which one to trust.
Five steps from BOM to an executable purchasing plan
Send the list once. We handle the reconciling, sourcing and substitution checks after that.
- Send your listPart numbers, quantities, target dates. An Excel file is ideal — a plain description works too.
- Quote in 4 hoursClass-A parts come back with price and lead time within 4 hours; Class-B within 24 hours.
- Line-by-line substitutionsFor EOL, over-budget or long-lead items we propose alternatives with side-by-side parameters.
- Kit confirmationWe flag shortage items and their ready dates. The complete subset ships first so your line keeps moving.
- One consolidated deliveryEverything ships as one lot, with batch and traceability information attached.
What we can kit
From the main controller down to a cents-level terminal — on one purchase order.
Active components
MCU & embedded, memory, power devices, analog & signal chain, wireless and RF modules.
Passives & mechanicals
MLCC, resistors, electrolytic capacitors, crystals and resonators, board-to-board and wire-to-board connectors, terminals and housings.
Obsolete & hard-to-find
EOL part numbers sourced globally, with verifiable substitution options.
Break-pack small parts
Below factory packaging quantities, we break packs so you don’t tie up cash on a full reel.
A real challenge, and how we solved it
BackgroundAn industrial control manufacturer was preparing a pilot run with a BOM of 80+ part numbers across six categories, sourced from six different suppliers — each requiring separate quoting and separate lead-time waits.
The challengePilot volumes were small and several suppliers would not take them. Three controller and interface ICs had factory lead times beyond 30 weeks, incompatible with the pilot schedule.
Our solutionWe quoted the whole BOM as one order and shipped the 77 in-stock line items first to start the pilot on time. For the three long-lead parts we presented two paths: spot-market sourcing and pin-to-pin alternatives, with free samples for validation.
The resultThe pilot started on schedule, and the validated alternative entered the volume selection list. Replace this sentence with your own verified figures, or delete it.
Frequently asked questions
Can you kit very small pilot volumes — tens of pieces?
Yes. There is no order-level minimum. Prototype quantities go through the same quoting flow, and where volumes fall below factory packaging we break packs and label the batch and break information.
What if I only have scattered part numbers, not a BOM spreadsheet?
Just list the part numbers, quantities and target dates — email or web form both work. Incomplete lists are fine; we will confirm the missing parameters with you one by one.
Can I specify brands and channels?
Yes. You can request specific brands and original channels. We also provide alternative quotes from advantageous channels and global distribution so you can weigh price against lead time.
How do you handle shortage items?
Shortage items are listed separately in the quote with a ready date. The complete subset can ship first while the rest follows, without holding up the whole delivery.
Do quotes include substitution proposals?
Yes. For EOL, over-budget or long-lead parts we proactively attach alternatives with key parameter comparisons, plus free samples for validation where needed.
Browse by category
Related services
Send your BOM — get a quote in 4 hours
Part numbers, quantities and target dates are enough. No list yet? Just describe what you need.
